When using the first type, the work is divided into the following stages:
In order to drop the foundation, they are used and installed on both sides, lighthouse shields (at a distance of 3 to 4 m from each other) and they are fixed using spacers. In order for the base under the house to become even, a multiple number of shields are placed between the boards;