— Before pouring on the bottom of the pit, pre -bound reinforcement or a special reinforcing mesh is laid,
— The bottom of the pit is poured with concrete in the ratio of 3 parts of the sand and 1 part of the cement with the addition of the required amount of crushed stone (according to the technology for manufacturing the structure).