Pipes for the removal of wastewater must be laid at a depth of at least 80 cm from the surface of the earth. Such a depth of laying...
Читать дальшеPipes for the removal of wastewater must be laid at a depth of at least 80 cm from the surface of the earth. Such a depth of laying...
Читать дальшеFeatures of the installation of the output system When arranging sewage system according to the septic tank + filter well, pipes from the house lead to a septic...
Читать дальшеCesspool Cesspool - the simplest building. Materials can be used for construction, which for a septic tank and a well, but no holes should be. There is no...
Читать дальшеIf the construction of the filter well is impossible, the filter channel is laid. Before laying sewer pipes, one or more trenches dug from the septic tank in...
Читать дальшеThe well is covered with a concrete lid with a hatch and a hole for a ventilation pipe. You can use the finished factory reinforced concrete product.
Читать дальшеThe drain pipe leading from the septic tank is inserted into the well through a hole specially made in the ring. The edge of the pipe must retreat...
Читать дальшеThe bottom of the well and the distance between the walls of the pit and the rings are covered with crushed stone, brick or concrete blocks. This prevents...
Читать дальшеThe depth of the pit for the well is determined by the level of groundwater. The diameter of the pit should be larger than the diameter of the...
Читать дальшеFilter well For the construction of the well, you can use special concrete rings of different diameters, but not less than 1 m., silicate brick, bottle stone, concrete...
Читать дальшеThe installed septic tank cover should fit tightly and have a ventilation hole for the output of methane. Find out how to make ventilation in a private house...
Читать дальшеУ нас вы найдете самые свежие новости ми- заходите, читайте, делитесь публикациями!
© 2017-2023 Новости в мире. Все права защищены.