The depth of the pit for the well is determined by the level of groundwater. The diameter of the pit should be larger than the diameter of the concrete ring by 60 — 80 cm. The bottom of the pit should be concreted so that the contour of the ring lowered into the pit is based on the concrete surface, and the center of the pit was not flooded with cement mortar. Each next ring is installed using a cement mortar.