In the event that the base under the house is not high, then boards will be needed, the height of which will be up to 50 cm. But...
Читать дальшеIn the event that the base under the house is not high, then boards will be needed, the height of which will be up to 50 cm. But...
Читать дальшеPlaet foundation When applying such a base under the house, it is necessary to dig a pit and insert the boards horizontally (into one tier). They should be...
Читать дальшеIf the formwork is installed on an uneven surface, then it is necessary to align the foundation, that is, make a spatch. For this, sand is brought, and...
Читать дальшеMount the lower step of the structure and concrete it; Install the second layer of formwork and pour it with solution; This method is being built by the...
Читать дальшеAfter the work performed, the formwork is dismantled in the reverse order. Installation of wooden formwork on a strip foundation For installation of stepped shape, it is necessary:
Читать дальшеTo strengthen the boards, use brackets (spring) or hooks (stretch); Since a continuous shape can have a height above a meter, for the convenience of filling with concrete...
Читать дальшеSide boards are fixed by longitudinal contractions; For their stability, the struts that are necessary are attached to them in order to leve shields (vertically);
Читать дальшеWhen using the first type, the work is divided into the following stages: In order to drop the foundation, they are used and installed on both sides, lighthouse...
Читать дальшеConsider the methods of installing formwork, for example, with a strip base under the house. In this case, one of two types of form is used: continuous or...
Читать дальшеWarming and not insulated; Special. The formwork design consists of three main details: fasteners, decks with shields and supporting forests. How to properly install the form, depending on...
Читать дальшеУ нас вы найдете самые свежие новости ми- заходите, читайте, делитесь публикациями!
© 2017-2023 Новости в мире. Все права защищены.