Preparation
The next step will be the preparation of the surface for laying the system. If necessary, the surface is carefully cleaned. After there is a layer of waterproofing, a damper tape is laid around the perimeter. So that the heat from the system remains in the room, it is necessary to warm the floor. A reinforcing mesh is laid on top and a screed is filled.