This is important! Outside, the boards are aligned with spacers that are driven into the ground and fastened with all the rows of formwork. They need to be supported by struts installed at a certain angle in the ground. The evenness of the angles (vertical and horizontal) is checked by applying the building level. After these work, the entire area of the base under the house is waterproofed.