Factory formwork
By the degree of disassemble, the formwork is divided into two types:
Removable formwork, which is subject to dismantling after recruiting with a building mixture of prescribed strength, capable of maintaining a given position in space and configuration of the outlines of the hardened structure. Historians assure that even when erecting the pyramids, ancient Egyptian builders used a mobile wooden formwork;