In order to not be collected in the ditches of atmospheric precipitation and crumbling earth, they are digging before the construction of the foundation.
Читать дальшеIn order to not be collected in the ditches of atmospheric precipitation and crumbling earth, they are digging before the construction of the foundation.
Читать дальшеIf there are no underground waters on the loam or clay land on the loop or clay land, then it is permissible to build vertical walls 1 or...
Читать дальшеThe range of ditches is completely dependent on indicators such as the level of ground and groundwater, the type of soil on the site and the depth of...
Читать дальшеStage 2. Earthwork Prior to the start of this work, it is necessary to remove the vegetable soil from the place of development. And in order for the...
Читать дальшеIn the event that the structure is not rectangular, then applying the above principle above, other markings are made; In this work, not only the axis of the...
Читать дальшеAlong with this, marking their thickness is made; Applying the square, determine the fourth corner of the building; To check the correctness of the marking, measure the diagonals,...
Читать дальшеStage 1. Marking This work allows you to determine the boundaries of the rectangle of the site on which the house is being built. For this: They note...
Читать дальшеThe second type is intended for stone buildings with a basement, basement or garage. Ribbon monolithic foundation Monolithic foundation construction technology
Читать дальшеIn turn, the strip foundation is divided into shallow and deepened types. The first of them forms a frame (horizontal) from a monolith, it is stable in heaving...
Читать дальшеA continuous monolithic foundation is laid under the whole structure, in the case when the soil can compress and squeeze the building. A monolithic foundation compared to its...
Читать дальшеУ нас вы найдете самые свежие новости ми- заходите, читайте, делитесь публикациями!
© 2017-2023 Новости в мире. Все права защищены.