Sand pillow for a monolithic foundation
Stage 3. Underground waters
In the event that their level of occurrence is below the depth of freezing of the soil, then the foundation is laid deep into 50 — 70 cm. And if groundwater is located almost on the surface, while the soil is fluffy, then the base of the building is 0.2 m below the level of freezing of the soil.