After the structure is built, then there is a lot of space inside the base box. If they plan to arrange a basement there, then the voids are covered with soil or expanded clay. Their height should coincide with the floor level.
After the structure is built, then there is a lot of space inside the base box. If they plan to arrange a basement there, then the voids are covered with soil or expanded clay. Their height should coincide with the floor level.
У нас вы найдете самые свежие новости ми- заходите, читайте, делитесь публикациями!
© 2017-2023 Новости в мире. Все права защищены.