Installation of formwork from polystyrene foam
The structure of the structure occurs every three rows, and the rods are laid on the door and window jumpers. In the next row, indispensable formwork of polystyrene foam is laid with some displacement in relation to the previous one, this is necessary for the design to acquire rigidity. In this case, the connection of vertical rows occurs using a non -pressure pressure on the block. So form three four rows.