Before the work, it is necessary to draw up a sketch and a schedule. On the sketch, they note the height of the layer, the place of the partitions, the angle of the slope, the location and orientation of the reinforcement. The temporary schedule contains information about the time of grasping and solidifying the concrete mixture and the intervals between the filling of individual layers. After pouring, each layer of concrete is thoroughly compacted and aligned.