When pouring concrete, stuffed piles are filled with a mixture, and T — figurative reinforcement is located vertically. The next layer of frame wire is laid horizontally. Its length is equal to the width of the piles along with welded limiters;
When pouring concrete, stuffed piles are filled with a mixture, and T — figurative reinforcement is located vertically. The next layer of frame wire is laid horizontally. Its length is equal to the width of the piles along with welded limiters;
У нас вы найдете самые свежие новости ми- заходите, читайте, делитесь публикациями!
© 2017-2023 Новости в мире. Все права защищены.