Pour the grillage — check the strength of the formwork and pour the concrete solution inside it, as they fill it up, compact it. Applying the building level, check the horizontality of the upper plane. After about two weeks, the formwork is removed.
Pour the grillage — check the strength of the formwork and pour the concrete solution inside it, as they fill it up, compact it. Applying the building level, check the horizontality of the upper plane. After about two weeks, the formwork is removed.
У нас вы найдете самые свежие новости ми- заходите, читайте, делитесь публикациями!
© 2017-2023 Новости в мире. Все права защищены.