grasping, during which all components of concrete are connected and react. This process cannot be violated. Its duration is from 3 hours at a temperature of 200. At lower temperatures, the start of setting occurs after 6 hours from closing, and with higher or heating — after 20-30 minutes. The beginning of the process can be accelerated or pushed by time using various additives. This value depends on the brand of concrete;